Major issues are listed below; (1) Readiness and integration of control software (2) Commissioning schedule, taking into account a variety of issues, including: o the funding situation facing the collaboration; o a wide-ranging R&D program, and high-visibility goals for ATF2; o the range of different optics required for different beam studies; o the reproducibility of optics and good beam quality required for ATF2; o scheduling of meetings; o external timing constraints (e.g. for completion of PhD theses). (3) Detailed planning of longer-term studies. It will be important to know the schedule for studies of fast extraction kickers, to be able to define the commissioning schedule for ATF2. The expected outcome of this meeting would be an optimized strategy and an overall schedule which would allow efficient ATF2 commissioning and minimized interference with various short and long term studies at ATF.
    • 09:00 12:00
      Integration of software in the ATF control system
      • beam tuning and hardware
      • flight simulator
      • 09:00
        Present Status of Hardware-direct Software R&D 30m
        Speaker: S.Boogert
        Slides
      • 09:30
        Present Status of High-Priority Software R&D 30m
        Speaker: C.Rimbault
        Slides
      • 10:00
        Present Status of Flight Simulator 30m
        Speaker: G.White
        Slides
      • 10:30
        break 30m
      • 11:00
        Present Status of Near-Future Study 30m
        Speaker: S.Kuroda
        Slides
      • 11:30
        Discussion 20m
        Speaker: All
    • 12:00 13:30
      Lunch 1h 30m
    • 13:30 14:10
      DR-emittance R&D 40m
      Speaker: Dr Kiyoshi Kubo (KEK)
      Beam time proposal
      DR emittance
    • 14:10 14:50
      Plan of fast kicker R&D 40m
      Speaker: Mr Takashi Naito (KEK)
      Slides
    • 14:50 15:20
      coffee break 30m
    • 15:20 16:30
      Commissioning schedule
      • strategy ; goals, team works,
      • schedule by end of 2008 and also in 2009
      • 15:20
        IP-BSM beam study in Dec.2008 15m
        Speaker: Mr Masahiro OROKU (Tokyo Univ.)
        Paper
      • 15:35
        Beam time request from SLAC team 15m
        Speaker: Dr Andrei Seryi (SLAC)
        Slides
      • 15:50
        ATF2 beam commissioning plan 15m
        Speaker: Dr Toshiyuki Okugi (KEK)
        Slides
      • 16:05
        Discussion for the beam time schedule 25m
        Exel file
    • 16:30 16:40
      coffee break 10m
    • 16:40 17:40
      BDS status and plan
      • what will be coming out from ATF2
      • 16:40
        BDS and ATF2 20m
        Speaker: Dr Andrei Seryi (SLAC)
        Slides
      • 17:00
        ATF2 magnet and PS lessons for ILC BDS 10m
        Lessons learned from designing, fabricating & installing ATF2 magnets and their power supplies that should be remembered for same tasks for the ILC’s BDS
        Speaker: Dr Cherrill Spencer (SLAC)
        Poster
    • 17:40 18:00
      Summary