Second ATF2 Project Meeting

chaired by A.Seryi and T.Tauchi
from to (Asia/Tokyo)
at KEK ( Meeting room, 1F, 3-gokan )
Tsukuba, Japan
Description
We will review the status and discuss the planning details for ATF2 in 2006.

The first meeting was held at SLAC, 3-5 February 2006, whose homepage is
http://www-project.slac.stanford.edu/ilc/meetings/workshops/ATF2/feb2006/ .

General information on ATF and ATF2 is available at http://atf.kek.jp/index_skip.html and http://atf.kek.jp/collab/md/projects/project_atf2.php .
Go to day
  • Tuesday, May 30, 2006
    • 09:00 - 09:30 Registration
    • 09:30 - 10:00 Introduction
    • 09:30 - 09:40 Greeting by J. Urakawa 10'
      Material: Slides powerpoint file} pdf file}
    • 09:40 - 10:00 Overview and meeting plan by T.Tauchi and A. Seryi 20'
      Material: Slides pdf file}
    • 10:00 - 12:00 Optics and Layout
      Finalization of the optics,  layout including conventional facilities
      Convener: Andrei Seryi (SLAC)
    • 10:00 - 10:40 Final optimization of optics by M.Woodley 40'
      Material: Slides powerpoint file} pdf file}
    • 10:40 - 10:50 Summary of tolerances for magnets by S.Kuroda 10'
      Material: Slides powerpoint file} pdf file}
    • 10:50 - 11:30 Layout and conventional facility by J.Urakawa and N.Terunuma 40'
      Material: Slides powerpoint file} pdf file}
    • 11:30 - 11:40 Optimization of the band width by A.Seryi 10'
      Material: Slides powerpoint file} pdf file}
    • 11:40 - 12:00 Discussion 20'
    • 12:00 - 13:30 Lunch
    • 13:30 - 15:30 IP configuration
      Convener: Philip Bambade (LAL/Orsay)
    • 13:30 - 13:50 CLIC table for the FD system by P.Bambade 20'
      Material: Slides powerpoint file} pdf file}
    • 13:50 - 14:10 IP Layout by T.Okugi 20'
      magnet configuration, QBPMs, beam pipe, movers
      Material: Slides powerpoint file} pdf file}
    • 14:10 - 14:30 Active supports for the FD system and Shintake monitor by R. Sugahara 20'
      Material: Slides powerpoint file} pdf file}
    • 14:30 - 14:50 Passive support for Shintake monitor by T. Kume 20'
      Material: Slides powerpoint file} pdf file}
    • 14:50 - 15:10 Stabilization between the above two ( by StaFF ), by D.Urner 20'
      Material: Slides powerpoint file} pdf file}
    • 15:10 - 15:30 Discussion 20'
    • 15:30 - 16:00 coffee break
    • 16:00 - 18:10 Production and Installation Policy (1)
      Magnet and support session, 
      BPM session
      Convener: Marc Ross (SLAC)
    • 16:00 - 16:30 Design of Magnets: FD, Bends, Sextupoles , by C.Spencer 30'
      Material: Slides powerpoint file} pdf filedown arrow
    • 16:30 - 16:50 Field measurement of QEA magnets, by M.Masuzawa 20'
      Material: Slides powerpoint file} pdf file}
    • 16:50 - 17:10 Magnet support system, by R.Sugahara 20'
      Material: Slides powerpoint file} pdf filedown arrow
    • 17:10 - 17:30 Vibration measurement of FFTB movers, by H.Yamaoka 20'
      Material: Slides pdf filedown arrow
    • 17:30 - 17:50 QBPM and IP-BPM, by Y.Honda 20'
      Material: Slides pdf file}
    • 17:50 - 18:10 Electronics, by M.Ross 20'
      Material: Slides powerpoint filedown arrow pdf filedown arrow
  • Wednesday, May 31, 2006
    • 09:00 - 11:00 Commissioning detailed plan
      Convener: Toshiyuki Okugi (KEK)
    • 09:00 - 11:00 Hardwares for the commisioning by T. Okugi 2h0'
      discussion
      Material: Slides powerpoint file} pdf file}
    • 11:00 - 11:20 coffee break
    • 11:20 - 12:20 Production and Installation Policy (2)
       Power supply session by P.Bellomo, M.Kumada
      Convener: Marc Ross (SLAC)
    • 11:20 - 11:50 Specification of bulk power supply, module and controller etc. by P.Bellomo 30'
      Material: Slides powerpoint file}
    • 11:50 - 12:20 Role sharing between KEK and SLAC , by M.Kumada 30'
      Material: Slides powerpoint file} pdf file}
    • 12:20 - 13:30 Lunch
    • 13:30 - 15:50 Production and Installation Policy (3)
      Laser, feedback/feedforward session by T.Takahashi,G.Blair,P.Burrows,T.Suehara, Y.Honda
      Convener: Marc Ross (SLAC)
    • 13:30 - 14:00 Laser facility for photon collider by T.Takahashi 30'
      Material: Slides powerpoint file} pdf file}
    • 14:00 - 14:30 Fast feedback(FONT) and feedforward system by P.Burrows 30'
      Material: Slides powerpoint file} pdf filedown arrow
    • 14:30 - 15:00 Laserwire system by D.Howell 30'
      Material: Slides pdf file}
    • 15:00 - 15:30 Shintake monitor by T.Suehara 30'
      Material: Slides powerpoint file} pdf filedown arrow
    • 15:30 - 15:50 Resonant cavity type monitor for future option by Y.Honda 20'
      Material: Slides pdf file}
    • 15:50 - 16:10 coffee break
    • 16:10 - 18:10 Scheduling strategy
       for installation of monitors and feedback/forward system etc.
      Convener: Grahame Blair (RHUL)
    • 16:10 - 16:25 Feeback and feedforward systems by P. Burrows 15'
      Material: Slides powerpoint file} pdf file}
    • 16:25 - 16:40 Fast kicker for the ILC bunch train structure by T. Naito 15'
      Material: Slides pdf file}
    • 16:40 - 16:55 Laser-wire by G.Blair 15'
      Material: Slides powerpoint file} pdf file}
    • 16:55 - 17:10 Shintake System by T.Suehara 15'
      Material: Slides powerpoint file} pdf file}
    • 17:10 - 17:25 IP-BPM and BSM with laser cavity by Y. Honda 15'
      Material: Slides pdf file}
    • 17:25 - 18:10 Discussion 45'
    • 18:10 - 20:10 Banquet
      Japanese food,  at Cranberry restaurant, KEK
  • Thursday, June 1, 2006
    • 09:00 - 11:00 ATF operation during construction and extraction line modifications
      Convener: Philip Burrows (Oxford univ., QMUL)
    • 09:00 - 11:00 R&D program at ATF during the ATF2 construction, by P.Burrows 2h0'
      Discussion,  may need agreement - proposal to the ICB?, Vancouver, July 2006?
      Material: Slides powerpoint file} pdf file}
    • 09:45 - 09:50 Laserwire by G.Blair 5'
      Material: Slides powerpoint filedown arrow pdf filedown arrow
    • 09:50 - 09:55 Cavity BPM by Y. Honda 5'
      Material: Slides pdf file}
    • 09:55 - 10:00 MonALiSA by D.Urner 5'
      Material: Slides powerpoint file} pdf file}
    • 10:00 - 10:05 Compton laser cavity, by T.Omori 5'
    • 10:05 - 10:10 ODR by P.Karataev 5'
      Material: Slides powerpoint file} pdf file}
    • 11:00 - 12:00 Summary
    • 11:00 - 12:00 convened by A.Seryi 1h0'
      Brief summaries are requested to the session conveners.
    • 11:00 - 11:05 Magnet and Support, by C.Spencer, R.Sugahara (M.Ross) 5'
      Material: Slides powerpoint filedown arrow pdf filedown arrow
    • 11:05 - 11:10 Powe Supply, P.Bellomo, M.Kumada (M.Ross) 5'
      Material: Slides powerpoint file} pdf filedown arrow
    • 11:10 - 11:15 Laser, feedback/feedforward, by Y.Honda (M.Ross) 5'
      Material: Slides pdf filedown arrow
    • 11:15 - 11:20 Optics and Layout, by A.Seryi 5'
      Material: Slides powerpoint file} pdf filedown arrow
    • 11:20 - 11:25 IP configuration, by P.Bambade 5'
      Material: Slides powerpoint file} pdf file}
    • 11:25 - 11:30 Commissionng Detailed Plan, by T.Okugi 5'
      Material: Slides powerpoint file} pdf file}
    • 11:30 - 11:35 Scheduling Strategy, by G.Blair 5'
      Material: Slides powerpoint file} pdf filedown arrow
    • 11:35 - 11:40 ATF operation during construction and extraction line modifications, by P.Burrows 5'
      Material: Slides powerpoint file} pdf file}
    • 11:40 - 11:45 Production and Installation Policy Session by M.Ross 5'
      Material: Slides powerpoint file} pdf file}
    • 12:00 - 13:30 Lunch
    • 13:30 - 15:30 Closed session on budgets
      KEK, SLAC,   EU, K.Yokoya,J.Urakawa,T.Tauchi,A.Seryi,G.Blair,P.Bambade,  etc.