Filter
iCal export
Event calendar file
I have read and understood the above.
I have read and understood the above.
Download current event:
Event calendar file
In order to enable an iCal export link, your account needs to have a key created. This key enables other applications to access data from within Indico even when you are neither using nor logged into the Indico system yourself with the link provided. Once created, you can manage your key at any time by going to 'My Profile' and looking under the tab entitled 'HTTP API'. Further information about HTTP API keys can be found in the Indico documentation.
In conjunction with a having a key associated with your account, to have the possibility of exporting private event information necessitates the creation of a persistent key. This new key is also associated with your account and whilst it is active the data which can be obtained through using this key can be obtained by anyone in possession of the link provided. Due to this reason, it is extremely important that you keep links generated with this key private and for your use only. If you think someone else may have acquired access to a link using this key in the future, you must immediately remove it from 'My Profile' under the 'HTTP API' tab and generate a new key before regenerating iCalendar links.
Permanent link for public information only:
Permanent link for all public and protected information:
Please use CTRL + C to copy this URL
Detailed timetable
More
Second ATF2 Project Meeting
chaired by A.Seryi and T.Tauchi
from
to
(Asia/Tokyo)
at KEK ( Meeting room, 1F, 3-gokan )
at KEK ( Meeting room, 1F, 3-gokan )
Tsukuba, Japan
| Description |
We will review the status and discuss the planning details for ATF2 in 2006. The first meeting was held at SLAC, 3-5 February 2006, whose homepage is http://www-project.slac.stanford.edu/ilc/meetings/workshops/ATF2/feb2006/ . General information on ATF and ATF2 is available at http://atf.kek.jp/index_skip.html and http://atf.kek.jp/collab/md/projects/project_atf2.php . |
Go to day
-
-
09:00 - 09:30
Registration
-
09:30 - 10:00
Introduction
-
09:30
- 09:40
Greeting by J. Urakawa
10'
Material: Slides
-
09:40
- 10:00
Overview and meeting plan by T.Tauchi and A. Seryi
20'
Material: Slides
-
10:00 - 12:00
Optics and Layout
Finalization of the optics, layout including conventional facilities
Convener: Andrei Seryi (SLAC) -
10:00
- 10:40
Final optimization of optics by M.Woodley
40'
Material: Slides
-
10:40
- 10:50
Summary of tolerances for magnets by S.Kuroda
10'
Material: Slides
-
10:50
- 11:30
Layout and conventional facility by J.Urakawa and N.Terunuma
40'
Material: Slides
-
11:30
- 11:40
Optimization of the band width by A.Seryi
10'
Material: Slides
-
11:40
- 12:00
Discussion
20'
-
12:00 - 13:30
Lunch
-
13:30 - 15:30
IP configuration
Convener: Philip Bambade (LAL/Orsay) -
13:30
- 13:50
CLIC table for the FD system by P.Bambade
20'
Material: Slides
-
13:50
- 14:10
IP Layout by T.Okugi
20'
magnet configuration, QBPMs, beam pipe, movers
Material: Slides
-
14:10
- 14:30
Active supports for the FD system and Shintake monitor by R. Sugahara
20'
Material: Slides
-
14:30
- 14:50
Passive support for Shintake monitor by T. Kume
20'
Material: Slides
-
14:50
- 15:10
Stabilization between the above two ( by StaFF ), by D.Urner
20'
Material: Slides
-
15:10
- 15:30
Discussion
20'
-
15:30 - 16:00
coffee break
-
16:00 - 18:10
Production and Installation Policy (1)
Magnet and support session, BPM session
Convener: Marc Ross (SLAC) -
16:00
- 16:30
Design of Magnets: FD, Bends, Sextupoles , by C.Spencer
30'
Material: Slides

-
16:30
- 16:50
Field measurement of QEA magnets, by M.Masuzawa
20'
Material: Slides
-
16:50
- 17:10
Magnet support system, by R.Sugahara
20'
Material: Slides

-
17:10
- 17:30
Vibration measurement of FFTB movers, by H.Yamaoka
20'
Material: Slides 
-
17:30
- 17:50
QBPM and IP-BPM, by Y.Honda
20'
Material: Slides
-
17:50
- 18:10
Electronics, by M.Ross
20'
Material: Slides 

-
09:00 - 09:30
Registration
-
-
09:00 - 11:00
Commissioning detailed plan
Convener: Toshiyuki Okugi (KEK) -
09:00
- 11:00
Hardwares for the commisioning by T. Okugi
2h0'
discussion
Material: Slides
-
11:00 - 11:20
coffee break
-
11:20 - 12:20
Production and Installation Policy (2)
Power supply session by P.Bellomo, M.Kumada
Convener: Marc Ross (SLAC) -
11:20
- 11:50
Specification of bulk power supply, module and controller etc. by P.Bellomo
30'
Material: Slides
-
11:50
- 12:20
Role sharing between KEK and SLAC , by M.Kumada
30'
Material: Slides
-
12:20 - 13:30
Lunch
-
13:30 - 15:50
Production and Installation Policy (3)
Laser, feedback/feedforward session by T.Takahashi,G.Blair,P.Burrows,T.Suehara, Y.Honda
Convener: Marc Ross (SLAC) -
13:30
- 14:00
Laser facility for photon collider by T.Takahashi
30'
Material: Slides
-
14:00
- 14:30
Fast feedback(FONT) and feedforward system by P.Burrows
30'
Material: Slides

-
14:30
- 15:00
Laserwire system by D.Howell
30'
Material: Slides
-
15:00
- 15:30
Shintake monitor by T.Suehara
30'
Material: Slides

-
15:30
- 15:50
Resonant cavity type monitor for future option by Y.Honda
20'
Material: Slides
-
15:50 - 16:10
coffee break
-
16:10 - 18:10
Scheduling strategy
for installation of monitors and feedback/forward system etc.
Convener: Grahame Blair (RHUL) -
16:10
- 16:25
Feeback and feedforward systems by P. Burrows
15'
Material: Slides
-
16:25
- 16:40
Fast kicker for the ILC bunch train structure by T. Naito
15'
Material: Slides
-
16:40
- 16:55
Laser-wire by G.Blair
15'
Material: Slides
-
16:55
- 17:10
Shintake System by T.Suehara
15'
Material: Slides
-
17:10
- 17:25
IP-BPM and BSM with laser cavity by Y. Honda
15'
Material: Slides
-
17:25
- 18:10
Discussion
45'
-
18:10 - 20:10
Banquet
Japanese food, at Cranberry restaurant, KEK
-
09:00 - 11:00
Commissioning detailed plan
-
-
09:00 - 11:00
ATF operation during construction and extraction line modifications
Convener: Philip Burrows (Oxford univ., QMUL) -
09:00
- 11:00
R&D program at ATF during the ATF2 construction, by P.Burrows
2h0'
Discussion, may need agreement - proposal to the ICB?, Vancouver, July 2006?
Material: Slides
-
09:45
- 09:50
Laserwire by G.Blair
5'
Material: Slides 

-
09:50
- 09:55
Cavity BPM by Y. Honda
5'
Material: Slides
-
09:55
- 10:00
MonALiSA by D.Urner
5'
Material: Slides
-
10:00
- 10:05
Compton laser cavity, by T.Omori
5'
-
10:05
- 10:10
ODR by P.Karataev
5'
Material: Slides
-
11:00 - 12:00
Summary
-
11:00
- 12:00
convened by A.Seryi
1h0'
Brief summaries are requested to the session conveners.
-
11:00
- 11:05
Magnet and Support, by C.Spencer, R.Sugahara (M.Ross)
5'
Material: Slides 

-
11:05
- 11:10
Powe Supply, P.Bellomo, M.Kumada (M.Ross)
5'
Material: Slides

-
11:10
- 11:15
Laser, feedback/feedforward, by Y.Honda (M.Ross)
5'
Material: Slides 
-
11:15
- 11:20
Optics and Layout, by A.Seryi
5'
Material: Slides

-
11:20
- 11:25
IP configuration, by P.Bambade
5'
Material: Slides
-
11:25
- 11:30
Commissionng Detailed Plan, by T.Okugi
5'
Material: Slides
-
11:30
- 11:35
Scheduling Strategy, by G.Blair
5'
Material: Slides

-
11:35
- 11:40
ATF operation during construction and extraction line modifications, by P.Burrows
5'
Material: Slides
-
11:40
- 11:45
Production and Installation Policy Session by M.Ross
5'
Material: Slides
-
12:00 - 13:30
Lunch
-
13:30 - 15:30
Closed session on budgets
KEK, SLAC, EU, K.Yokoya,J.Urakawa,T.Tauchi,A.Seryi,G.Blair,P.Bambade, etc.
-
09:00 - 11:00
ATF operation during construction and extraction line modifications