========================================= Meeting Minutes: Monday, June 18, 2007 ========================================= Discussed Ken's/Mike's suggestion of setting up Work Packages (WP) for polarimetry throughout a three year period (EDR-phase), see below... Should also include energy and emittance measurements that will very likely take place within the same magnetic chicane. Suggestion to have a annual workshop on polarisation & energy measurement. Most likely next spring, i.e. March/April 2008 ? Proposal to write-up what we intend to do (WP contents) by the end of the year. Might have a first draft ready before christmas 2007. Should meet at least once before... Agreed on monthly video/phone meeting: 1st Monday in a month. Jenny will handle the agenda @indico & email. Polarimeter Work Packages (WPs): complete ================================ Leader: ??? * polarized electron and positron source, * low energy polarimeters, * helicity flipping / spin rotation / transport to IR, * optimization at IR, * BDS Polarimeters Studies of spin diffusion and depolarization effects. Studies of systematic errors in determining the luminosity averaged polarization at the IR from the measurements in the upstream and downstream polarimeters. Work SubPackages: ================= "Low energy polarimeters" Leader: ??? ======================================================= BDS Pol. WP: "Compton Polarimeters in the beam delivery system and the extraction lines" Leaders: Ken (SLAC), Jenny (DESY) ======================================================= SubWP 1: "Upstream pol. design, optics, background and performance" Leader: Jenny (group), Peter SubWP 2: "Downstream pol. design, optics, background and performance" Leader: Mike, Ken (Optics, esp. magnets, vacuum chambers: Peter) SubWP 3: "Cherenkov det. for up-/downstream Compton pol." Leader: Jenny (group) SubWP 4: "Lasers for up-/downstream Compton pol." Leader: Peter (upstream), Ken/Mike (downstream, both?) SubWP 5: "Laser light transport lines and diagnostics before and after Compton IP" Leader: Peter/Norbert(?), Ken SubWP 6: "Conventional facilities" for laser rooms, electronics / control rooms, penetrations for laser transport lines to Compton IP, power, air conditioning, clean room, water requirements Leader: Ken / (Peter as a mirror @DESY) SubWP 7: "Computer, DAQ, control, data from source and spin rotators, data to experiment" Leader: ??? (evt: Stefan Schmitt from HERA pol.?) Next Meeting: July, 2