HLRF Technical System Weekly Meeting

US/Pacific
SLAC: SCS 115, 3-5PM PDT (High Level RF TS Review)

SLAC: SCS 115, 3-5PM PDT

High Level RF TS Review

Description
1. Review status of major HLRF subsystem, components in Baseline Conceptual Design. 2. Review progress of RDR Cost Modeling and Estimates, resource assignments, standard methodologies. 3. Review R&D progress for Alternate Conceptual Designs.
    • 03:00 03:20
      Agenda & Goals 20m
      Speaker: Raymond Larsen (SLAC)
    • 03:20 03:40
      KEK Progress 20m
      Speaker: Dr Shigeki Fukuda (KEK)
    • 03:40 04:00
      Distribution Costs 20m
      Speaker: Dr Christopher Nantista (SLAC)
    • 04:00 04:20
      Klystron Status 20m
      Speaker: Chris Adolphsen (SLAC)
    • 04:20 04:40
      Modulator Progress 20m
      Speaker: Chris Jensen (FNAL)
    • 04:40 05:00
      Controls/Interlocks/Protection Status 20m
      Speaker: Richard Cassel (SLAC)