Electronics Meeting

Europe/Zurich
Salle de conference (LLR)

Salle de conference

LLR

http://polywww.in2p3.fr
Remi Jean Noel Cornat (LLR/IN2P3/CNRS)
Description
DIF and DAQ running modes of the detector signals
Minutes
    • 09:00 11:45
      Si-W ECAL DIF & mechanics
      • 09:00
        High voltage path 20m
      • 09:20
        Gluing of ASU 20m
      • 09:40
        DIF specifications : mechanics & electronics 40m
        document
    • 11:45 12:45
      Lunch break 1h
    • 15:30 15:45
      break 15m
    • 15:45 17:45
      CCC-LDA, signal integrity, grounding, power supply, cooling
      • 15:45
        Clocks and time alignment 40m
        Slides
      • 16:25
        Very Fast commands and commands 20m
      • 16:45
        Resets 20m