ATF2 weekly meeting

Asia/Tokyo
Draft Minutes (6/19, red for corrections)
    • 14:30 15:30
      International phone/webex meeting
      • 14:30
        Monalisa schedule in this summer 20m
        Discussion and decision of the schedule with Today's Monalisa status
        Speakers: Dr Andrea Jeremie (LAPP), Dr David urner (University of Oxford)
        • Present Status of Monalisa 5m
          Speakers: Dr David urner (University of Oxford), Dr Paul Coe (John Adams Institute for Accelerator Science, University of Oxford)
          Slides
      • 14:50
        Update of ATF2 priorities and schedule 20m
        Speakers: Dr Andrei Seryi (SLAC), Philip Bambade (Laboratoire de l''Accelerateur Lineaire (LAL) (IN2P3) (LAL))
        Draft schedule Summer-Winter 09
        Draft schedule Summer-Winter 09-pdf
        P.Bambade's file
        T.Tauchi's file
        • Stripline BPM issues 5m
          Speaker: Dr Toshiaki Tauchi (KEK)
          Slides
    • 15:30 16:30
      KEK site meeting (Japanese)
      • 15:30
        Progress of Shintake monitor work 20m
        Speakers: Mr Masahiro OROKU (Tokyo Univ.), Mr Takashi Yamanaka (The University of Tokyo)
        Slides
        Time: 17:00 (JST) - Site: ATF LC container meeting room (KEK) Participants: Terunuma, Tauch, Okugi, Yamanaka, Oroku * Damage threshold of optics - Sigma Koki optics now used in IP-BSM reach limit when EXT LW laser is used. -> if the replacement of optics is needed, they should be done in this summer shutdown. - need to prepare laser dump before making transport line * Laser transport line from EXT LW - It is no problem with Aryshev's plan * Injection to the Shintake monitor optical table - inject from the north side of the table in beam height (EXT LW laser height is already in beam height) - attach horizontally movalble mirror to switch the EXT LW laser and the present laser * Slit of knife edge - should care not only the roughness but also the uniformity of the edge * Detector upgrade - install gain monitor to calibrate the light correction efficiensy of all blocks of scintillator - make new housing for nitrogen parge - make fan for stabilize temparature * Schedule - should make a schedule during the summer shutdown - should place priority on making screen monitor and so on rather than making the laser transport from EXT LW