news from LLR (Mickael)
assembly mould designed
asked companies for estimates
order in ~2 weeks time
now concentrate on producing EUDET layers in salle blanche
keep U and H options for now.
should make decision on this after summer vacation
news from LAL (Roman)
Prof Chai (SKKU, Korea) visited this week. Will produce half the EUDET ECAL FEV8 PCBs
planning of assembly rrom started, will be ready ~end 2010
- areas to produce slabs, test them (cosmics?), slide into structure
working hard on SKIROC2 design, to be submitted before Arlington CALICE mtg (next week)
news from LPSC
Julien will go to CALICE@Arlington
mould ready to make first 2.5m ECAL cell (for endcap), will be done next week.
thermal simulations advanced, and describe results of thermal tests well.
connection tests for EUDET continuing
- test different thermal greases etc
will want to do long term tests with EUDET module
should discuss cooling with ILD integration peoples (Matthieu Jore et al)
(Marc) ILD-ecal will maybe go to 2-rail design soon (with wider rails)