Time: 16:00 (JST) -
Site: ATF LC container meeting room (KEK)
Participants: Terunuma, Tauchi, Okugi, Kuroda, Kamiya, Oroku, Yamanaka
* Schedule during summer shutdown is made.
* Screen monitors and knife edge
- Two design of linear motion stage were presented. Seiwa one is selected.
- How to adjust the screens and knife edges at the IP?
-- movable mechanics is needed but should be rigid
* Additional collimator after the bending magent flange
- it should be after the detector for wire scanner.
- need to negotiate Aryshev with the position of the detector and additional collimator.
* Laser injection path to the IP-BSM vertical table
- to use the present laser path, EXT LW laser should inject at the upstream in the table.
- to do so, pass the EXT LW laser in beam height from the north wall to the table,
drop just beside the table and inject from the lower height