Main Linac - KOM

GMT
Fish Tank (FNAL)

Fish Tank

FNAL

Wilson Hall 13th floor
Chris Adolphsen (SLAC)
Description


For webex meeting click here
Password ilcml
Minutes
  • Thursday, 27 September
    • 09:00 12:00
      Introduction, Test Facilities and ACD Time Lines
      • 09:00
        Introduction 15m
        Discuss time line for delivering the EDR, cutoff dates for changes (including ACD), cost and schedule responsibilities and interactions among ML groups and with other high level groups
        Speaker: Akira Yamamoto
        Slides
      • 09:15
        Observations from the KOM Meetings So Far 15m
        Speaker: Nick Walker
        Slides
      • 09:30
        What the ILCTA@NML and STF will NOT Tell Us for the EDR by 2011 20m
        Speaker: Sergei Nagaitsev
        Slides
      • 09:50
        What XFEL Will Tell Us for the EDR by 2011 20m
        Speaker: Hans Weise
        Slides
      • 10:10
        Coffee Break 30m
      • 10:40
        ACD Down-Select Criteria and Time Scales for HLRF 20m
        Speaker: Shigeki Fukuda
        Slides
      • 11:00
        ACD Down-Select Criteria and Time Scales for Cavity Shapes and Processing 20m
        Speaker: Lutz Lilje
        Slides
      • 11:20
        ACD Down-Select Criteria and Time Scales for Cavity Assembly and Peripherals 20m
        Speaker: Hitoshi Hayano
        Slides
      • 11:40
        ACD Down-Select Criteria and Time Scales for Cryomodules 20m
        Speaker: Harry Carter
        Slides
    • 12:00 13:30
      Lunch
  • Friday, 28 September
    • 09:00 12:00
      Integration Issues

      This session is to allow people to present issues than span technical groups, including CFS and LLRF

      • 09:00
        Wakes and Cavity Design 20m
        Includes proposal for reducing wake offsets due to asymmetric antennae penetrations
        Speaker: Chris Adolphsen
        Slides
      • 09:20
        Coupler Diameter, Multipacting and Tunability 20m
        Surveys pros and cons of different coupler choices
        Speaker: Chris Adolphsen
      • 09:40
        Waveguide Heat Loads 20m
        Size and implications for CFS and LLRF
        Speaker: Chris Nantista
        Slides
      • 10:00
        LLRF Requirements 20m
        Includes discussion of desired overhead and HLRF bandwidth
        Speaker: Brian Chase
        Slides
      • 10:20
        Coffee Break 30m
      • 10:50
        CFS Requirements 20m
        Includes a discussion of how the linac alignment requirements (both spatial and temporal) should be specified for installation and site evaluation
        Speaker: Tom Lackowski
        Slides
      • 11:10
        Cryogenic Issues 20m
        Includes discussion of layout and input required from other groups
        Speaker: Tom Peterson
        Slides
      • 11:30
        Quad Field and Position Stablity 20m
        Review of short and long term quad stability requirements and implications for the support system
        Speaker: Chris Adolphsen
        Slides
    • 12:00 13:30
      Lunch
    • 13:30 17:30
      Cost and Design Optimization
      • 13:30
        General Cost Model and Gradient and Gradient Spread Dependence 40m
        Speaker: Chris Adolphsen
        Slides
      • 14:10
        Example Tradeoff: Additional Cryo Cost vs Savings from Removing 5K Shield 20m
        Speaker: Tom Peterson
        Slides
      • 14:30
        Coffee Break 20m
      • 14:50
        Main Linac Cost Summary, Drivers and Technical and Cost Risks 20m
        Speaker: Tetsuo Shidara
      • 15:10
        MLI Meeting Comments 30m
        Speaker: Nick Walker
        Slides