Calice TB Review Meeting

US/Central
Wilson Hall bldg., 3NW – Theory room (16th), SiDet’s Video conference room (17th) (FNAL)

Wilson Hall bldg., 3NW – Theory room (16th), SiDet’s Video conference room (17th)

FNAL

Jaehoon Yu (University of Texas at Arlington), Jose Repond (Argonne National Laboratory), Roman Poeschl
Description
Description: Charge to the TB review on June 16-17 at FNAL The charge of the review is to assess the status of the US DHCAL project and the various technical prototype projects, and to establish a view on the forthcoming developments in terms of production, test, commissioninng and integration. The outcome should provide a basis for the planning of CALICE test beam activities in the next two years. 1. US DHCAL The TB should review - RPC production: availability of components, schedule, manpower and tooling for construction - status of electronics production and test - RPC readout integration and commissioning sequence - Mechnical integration into teh absorber structure - supplies and services - slow control and daq integration In particlular, a few critical milestones should be defined in order to allow following the progress. Based on this time line an outlook on a possible beam test scenario in 2009-10 should be given. Funding uncertainties should be pointed out. A major goal is to discuss the integration into the CALICE test beam set-up in terms of mechanics, services, slow control and DAQ. The interfaces should be identified and defined where possible. A perspective on the development of the GEM option should be included. 2. Technical prototypes Likewise, the TB should reach an understanding of the status of the EUDET ECAL and AHCAL technical prototypes and the European DHCAL projects with GRPCs and Micromegas readout, and discuss the envisaged sequence from demonstrator type tests to larger detectors. Also here critical milestones should be defined for - integration of detector and full readout chain - large area tests - multi-layer integration and test The needs for the definition of interfaces in mechanics, electronics, slow control and DAQ should be identified. Since we are looking further ahead here, options are still open. The TB should obtain a view on critical decisions to be taken in the near and mid-term future, and how the decisions are going to be prepared. The TB should get a coarse idea about the reach of presently secured funding and at which point new sources need to be found. In view of the variety of projects, the TB should check for possible bottlenecks in the availablity of common resources, like mechanical structures, test equipment, DAQ set-ups and manpower support.
Participants
  • Christophe de LA TAILLE
  • Jaehoon Yu
  • Jose Repond
  • Niels Meyer
  • Roman Poeschl
  • Tohru Takeshita
  • Tuesday, 16 June
    • Opening Session
      • 1
        Introductory Remarks
        Speaker: Roman Poeschl
        Slides
      • 2
        Review on Past Testbeams
        What we did achieve, what was good what was bad
        Speaker: Jaehoon Yu (University of Texas at Arlington)
        Slides
    • Testbeam SiW Ecal, US-DHCAL and TCMT
      • 3
        Overview (general plan)
        Speaker: Dr Jose Repond (Argonne National Laboratory)
        Slides
      • 4
        Run plan
        Speaker: Dr Jose Repond (Argonne National Laboratory)
      • 5
        SiW (readiness, transport, installation, commissioning)
        Speaker: Roman Poeschl
        Slides
      • 6
        Status and Plans for GEM's
        Speaker: Jaehoon Yu (University of Texas at Arlington)
        Slides
      • 7
        TCMT (readiness)
        Speaker: Vishnu Vikhyat Zutshi (Northern Illinois University)
      • 8
        RPC (construction, QA) + Cassette (design, integration)
        Speaker: Mr Qingmin Zhang (ANL & IHEP)
        Slides
      • 11:10
        Coffee break
      • 9
        Electronics (construction, testing)
        Speaker: Gary Drake (High Energy Physics Division-Argonne National Laboratory-Unknown)
        Slides
      • 10
        DAQ software and event display
        Speaker: James Schlereth (High Energy Physics Division-Argonne National Laboratory)
      • 11
        Event building Software filtering for cosmics/noise runs Data storage
        Speaker: Dr Lei Xia (Argonne National Laboratory)
        Slides
      • 12
        Offline and simulation
        Speaker: Jacob Smith (tbc) (ANL)
      • 13
        HV, gas and slow control
        Speaker: Burak Bilki (University of Iowa-Unknown-Unknown)
        Slides
    • 12:55
      Lunch break
    • Future of Calice Program
      • 14
        Calice R&D in the global context
        Speaker: Felix Sefkow (DESY)
        Slides
      • 15
        Status and Plans of SiW Ecal
        Speaker: Daniel Jeans (Ecole Polytechnique)
        Slides
      • 16
        Status and Plans of ScEcal
        Speaker: Prof. Tohru Takeshita (Shinshu University)
        Slides
      • 17
        Status and Plans of TCMT
        Speaker: N.N.
      • 18
        Status and Plans of ScEcal of US-DHCAL
        Speaker: Dr Jose Repond (Argonne National Laboratory)
        Slides
      • 15:40
        Coffee break
      • 19
        Status and Plans of AHCAL
        Speaker: Felix Sefkow (DESY)
        Slides
      • 20
        SDHCAL - GRPC
        Speaker: Mr imad laktineh (ipnl)
        Slides
      • 21
        Status and Plans of Micromegas for DHCAL
        Speaker: Dr Yannis Karyotakis (Lab. d'Annecy-le-Vieux de Phys. des Particules (LAPP/IN2P3/CNRS Uni. de Savoie))
        Slides
      • 22
        Front End Electronics
        Speaker: Dr Christophe de LA TAILLE (OMEGA/IN2P3)
        Slides
      • 23
        Data Acquisition System(s)
        Speaker: Dr Matthew Wing (UCL)
        Slides
      • 24
        Software for future Calice Testbeams
        Speaker: Dr Niels Meyer (DESY)
        Slides